Quality Control:
1. Strict Inspection on incoming materials
1.1 Every batch of incoming materials must be made randomized RoHS test
1.2 Every batch of incoming plastic parts must be made reliablity test as follows:
High Temperature Test |
+80 degree centigrade 48 hours |
Low Temperature Test |
-40 degree centigrade 48 hours |
Melt Index of Soluble (MI value) |
According to the specifications |
Falling Test |
According to the specifications |
Glacial Acetic Acid Test |
99.5% acetic acid, soak for 2 mins |
2. In-process Inspection
2.1 100% electricial performance test, based on hourly statistics
Target: Defective rate <= 0.25%
2.2 To make reliability test (bending, spin, tension )on every batch of work order based on every four hours
2.3 At least montly reliability test for antenna of the same structure type for bending, spin, tension, high temperature, low temperature, salt spray, rolling
2.4 Weekly quality assurance meeting to check the status according to the SPC statistics
Checklist:
1) Incoming material inspecition problem
2) In-process inspection problem
3) Customer complaint
Testing Equipment
Quality Assurance Equipment
Standard:RoHS Number:TST20210904029-3RC Issue Date:2021-09-27 Expiry Date:2023-09-26 Issued By:Dongguan TST Technology Co., Ltd |
Standard:CE Number:FCSR20220511101 Issue Date:2022-03-25 Expiry Date:2026-03-24 Scope/Range:Antenna Issued By:Flux Compliance Service Laboratory |
Standard:High-tech enterprise Number:GR202144003765 Issue Date:2021-10-20 Expiry Date:2023-10-19 |
Contact Person: Shirley Yang
Tel: +86 13829115061
Fax: 86-769-81090291